The Mersey Gateway Bridge will be a landmark structure that will be recognisable throughout the North west. A new six lane toll bridge, over 2000 metres long will span the river Mersey between the towns of Runcorn and Widnes will open to relieve the congested and ageing Jubilee bridge.

Rapid EPS, along with their UK distributor, Altrad Beaver 84 are pleased to be supplying Rapid Panels, steel support posts, concrete socket bases and slab grabs to this project. The scheme is due to be completed by Autumn 2017.