Concrete frame apartments – a prestigious build located at the gateway of the city of London.

Traditional ‘drill and fix’ edge protection was already being used here, but the concrete had shown cracks at the point of penetration. The RAPID EPS system – which does not need to drill into concrete – was recognised as superior as soon as the kit arrived on site, so the initial order of only 500m to fill-in was immediately quadrupled for this project.