Speak To Us

RAPID EPS Unit D Treefield Industrial Estate, Gelderd Road, Gildersome Leeds LS27 7JU

Bolt On Socket

EU103/NA103

The Bolt on Socket system is used on steel frames and requires the steelwork contractor to bolt the socket to the top of the perimeter beam at centres specified by a technical team.

Chevron Icon
benefits of using Bolt On Socket
  • Utilising the steel frame Support Post and Rapid Panel/Barrier, the installation of this steel frame edge protection system can be carried out swiftly and safely at ground level.
Get a quote for hire or purchase
Chevron Icon

RAPID-EPS TRAINING

At our recently upgraded training centre in Leeds, product training and training covering the standard for temporary edge protection systems, BSEN13374:2013+A1.2018 is available to all customers.

The level of training undertaken at the Rapid Centre will involve practical sessions including product installation and hazard identification and also theory session.

Find out more about our training
Brochure image
 icon
 icon
 icon
 icon
 icon
 icon
 icon
Download our brochure today!
Download Brochure

Hey there, couldn’t help noticing you’re using Internet Explorer

That’s great and all, and we commend you for pushing through with it. Unfortunately we no longer offer support for IE; it hasn’t received a major update since 2015 and Microsoft are dropping support for it later in the year.

If you’re using Windows 10 and want to stick with a built in browser, please consider switching to Edge. Or, if you really want to enjoy the internet properly we strongly recommend downloading Google Chrome here.