Speak To Us

RAPID EPS Unit D Treefield Industrial Estate, Gelderd Road, Gildersome Leeds LS27 7JU

Slab Grab

EU008/NA008

A fully tested solution where Rapid Post or drill and fix solutions are precluded. This clamping solution precludes the need to drill and fix, improving installation time as well as exposure to Silica Dust and HAVS. Made from mild steel and hot dip galvanized for longevity.

Chevron Icon
benefits of using Slab Grab
  • Adjustable height on floor slabs: 100mm – 325mm thickness.
  • Robust tensioning facility.
  • Install a safe working at height area in minutes.
  • The system requires Slab Grab, Standard Support Post and Rapid Panel for BSEN 13374:2013+A1.2018 Class A edge protection.
Get a quote for hire or purchase
Chevron Icon
Patterned background

Installation Guide

Slab-Grab.pdf
File Format : pdf
Filesize : 1 MB
Updated : 07/06/2022
Download

RAPID-EPS TRAINING

At our recently upgraded training centre in Leeds, product training and training covering the standard for temporary edge protection systems, BSEN13374:2013+A1.2018 is available to all customers.

The level of training undertaken at the Rapid Centre will involve practical sessions including product installation and hazard identification and also theory session.

Find out more about our training
Brochure image
 icon
 icon
 icon
 icon
 icon
 icon
 icon
Download our brochure today!
Download Brochure

Hey there, couldn’t help noticing you’re using Internet Explorer

That’s great and all, and we commend you for pushing through with it. Unfortunately we no longer offer support for IE; it hasn’t received a major update since 2015 and Microsoft are dropping support for it later in the year.

If you’re using Windows 10 and want to stick with a built in browser, please consider switching to Edge. Or, if you really want to enjoy the internet properly we strongly recommend downloading Google Chrome here.